Façade Conservation

The façade works included cleaning, re-pointing of the brick and stone, stone repair, sealing and window restoration. The façade was stabilised to the building by tying it by structural steel installed in the floors of the building.

The parapet balustrade was dismantled and reconstructed with new lead work installed as appropriate.